Dongguan Metro Line 1 Phase I
Place:Dongguan
Detailed introduction
On 28 November 2025, Phase I of Dongguan Metro Line 1, with Fangda platform screen doors, officially began operations and marked Dongguan’s entry into the Metro 2.0 era. Phase I is 57.468 km long with 25 stations (22 underground, 3 elevated), and is the largest municipal project funded by the Dongguan government. The Fangda system uses AI sensing to monitor doors in real time. Its anti-pinch design and AI gap detection improve safety and efficiency. In January 2025, Fangda Innotech was named “Advanced Supplier of Dongguan Metro Line 1 for 2024.”Line 1 crosses Line 2 at the city center, forming Dongguan’s metro backbone. It offers easy transfers to intercity lines and will link with Guangzhou and Shenzhen metros, strengthening rail connectivity in the Greater Bay Area.
Back to list