CN EN

Business Scope

Jurong Region Line (JRL) of Singapore MRT

Place:Singapore
Detailed introduction
The JRL is 24 km long with 24 stations, and will serve residents and commuters in Choa Chu Kang, Boon Lay and Jurong Region and the future development of Tengah area. At present, 3-vehicle trains are designed for the line. Fangda PSD system will support the operation of a fully automated driverless MRT system with 4-vehicle trains and 75m long platforms.
Back to list