CN EN

Business Scope

Phase 2 of Shenzhen Metro Line 8

Place:Shenzhen, Guangdong
Detailed introduction
In December 2023, Phase 2 of Shenzhen Metro Line 8 was officially opened. This PSD system project undertaken by Fangda Innotech is the first application case of modular assembly platform screen door in Shenzhen.  
Back to list